Vietnam 1,800 m Solar Roof Walkway Project

Project Reference · Vietnam

Vietnam 1,800 m FRP Solar Roof Walkway Project

This rooftop PV access project was supplied with 500 FRP grating panels, short support rails and roof-fixing hardware. The documented panel size is 3,600 × 1,220 × 38 mm, giving 1,800 m of nominal panel length before site cuts, turns and transitions.

FRP maintenance walkway beside rooftop PV arrays in Vietnam
500 FRP panels 3,600 mm long · 1,220 mm wide · 38 mm thick
Project Snapshot

Documented Supply Scope

The project record provides panel dimensions, quantities and the main support hardware. This case study keeps those project-specific figures separate from general product claims or universal installation rules.

1,800 mNominal panel length
500 pcsFRP grating panels
1,220 mmPanel width
38 mmPanel thickness
3,600 mmPanel length
Length calculation: 500 panels × 3.6 m per panel = 1,800 m of nominal panel length. Actual installed route length can differ where panels are cut or where the route includes turns, gaps and transitions.
Rooftop Access

Maintenance Route Through the PV Array

On a large commercial roof, the walkway needs to connect the areas technicians actually service. Route planning therefore has to be coordinated with the PV layout, roof structure, access points and rooftop obstructions rather than treated as a separate line item.

FRP rooftop access route between solar PV arrays

Route planning checks

  • Service access: connect the PV areas and equipment that require routine inspection or maintenance.
  • Roof structure: coordinate support locations with the actual roof construction and approved fixing detail.
  • Obstructions: account for vents, skylights, plant equipment and other rooftop features.
  • Transitions: plan turns, endpoints and changes in level before panel cutting begins.
  • Site access: connect the walkway route to practical roof entry and maintenance points.
FRP Grating Panels

Walkway Panel Specification

The documented walkway sheets are Fiberglass Reinforced Plastic (FRP) panels. The project record lists two mesh options and a panel weight per square metre.

Panel data from the project record

  • Material: Fiberglass Reinforced Plastic (FRP)
  • Panel size: 3,600 × 1,220 × 38 mm
  • Mesh options: 38 × 38 mm or 40 × 40 mm
  • Listed weight: 19.5 kg/m²
  • Project quantity: 500 panels
FRP grating panel used for a rooftop PV maintenance walkway
Support & Fixing

Support Rails and Roof Connections

The supply list also includes short rail sections, connection components and self-tapping screws. These quantities describe this project only; they should not be reused as a spacing rule for a different roof.

FRP Panel→ Connection Hardware→ Support Rail→ Roof Fixing→ Roof Structure
Support rail and roof fixing beneath an FRP rooftop walkway

Documented hardware

  • Support rail size: 41 × 41 × 2.0 × 400 mm
  • Support rail quantity: 244 pcs
  • Self-tapping screws: M6.3 × 60
  • Screw quantity: 488 pcs
  • Other hardware: connection components included
Design note: final support positions and roof fixing must be checked against the actual roof structure, walkway loading requirements and approved project details.
Installation Coordination

Plan the Full Route Before Cutting Panels

A long rooftop access route is rarely a single uninterrupted straight run. Coordinating the route before installation helps keep panel cuts, support positions and transitions aligned with the actual maintenance path.

Items to confirm on site drawings

  • PV layout: module rows, service corridors and equipment zones
  • Roof construction: suitable support and fixing locations
  • Obstructions: vents, skylights and rooftop plant
  • Route geometry: straight runs, turns and endpoints
  • Panel cutting: lengths required around site geometry
  • Access points: roof entry and maintenance approach
Rooftop walkway transition within a solar PV maintenance route
Project Takeaways

What This Project Illustrates

1

Access planning belongs in the roof layout

The walkway route needs to be coordinated with the solar array and maintenance points so technicians can reach the areas they need to service.

2

Panels and supports work as one assembly

The grating panels, support rails, connection components and roof fixings have to be considered together when the installation detail is developed.

3

Large quantities require route-level coordination

With 500 panels in the supply scope, sequencing, cutting and transitions need to be planned across the full roof instead of panel by panel.